Railroad Crossing Update We have engaged with the new firm to do the railroad crossing. The first step was soil borings that were done March 9. It will take a couple of weeks to analyze the data and get back to the design engineer to determine the best course of action and get a cost proposal.
Recorded value
{
"status": "active",
"summary": "Soil borings were completed March 9; data analysis will inform design and a cost proposal."
}